Embarking on a career journey with Saudi Aramco, one of the world's leading oil and gas companies, is an aspirational goal for many professionals. If you're eyeing the crucial role of a Work Permit Receiver, preparing for the interview is key to your success. In this blog post, we'll delve into the essential interview questions you can expect and offer insightful answers to help you stand out. From understanding the specific responsibilities of a Work Permit Receiver to demonstrating your knowledge in safety protocols and operational efficiency, we'll guide you through the nuances of impressing your interviewers at Saudi Aramco. Whether you're a seasoned professional or a newcomer to the industry, these insights will equip you with the confidence and knowledge to navigate this pivotal career step.

Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.



1. Who is responsible for signing the work permit issuance or reception?

   Correct Answer: The issuer or receiver.


2. What is the standard validity duration for a work permit issuer or receiver certificate?

   Correct Answer: 1 year.


3. Identify two primary purposes of using work permits.

   Correct Answer: To communicate and control work; To track contractors and manage emergencies.


4. Why are work permits essential in hazardous areas?

   Correct Answer: To identify hazards and precautions.


5. Under what conditions are work permits typically issued?

   Correct Answer: For specific work at a specific location.


6. What details are generally included on a work permit?

   Correct Answer: Minimum safety precautions.


7. What is the main objective of the work permit system?

   Correct Answer: To prevent incidents.


8. How is a restricted area defined?

   Correct Answer: By issued work permits.


9. When can a work permit issuer decide a permit is not needed in a restricted area?  

   Correct Answer: Never! They are always required in restricted areas.


10. Provide examples of low-risk work. 

    Correct Answer: Cold work, light work, non-destructive testing.


11. When is a specific area typically not considered restricted?  

    Correct Answer: When a joint site inspection is not required.


12. Why might a designated representative be needed?

    Correct Answer: The issuer requires assistance due to a busy schedule.

Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.

13. What are the core responsibilities of receivers?

    Correct Answer: Complying with safety precautions and signing the permit.


14. What duties does an issuer have?

    Correct Answer: Defining safety precautions and signing the work permit.

15. What qualification is required for a receiver?

    Correct Answer: A qualified engineer.


16. What is a shared responsibility of issuers and receivers?

    Correct Answer: Safety at the work site.


17. Why must the issuer inform the receiver about job site safety hazards?

    Correct Answer: The receiver may not have worked in the area before.


18. Before issuing a work permit, what must the issuer do?

    Correct Answer: Check the receiver’s certificate and get counter signatures.


19. Who is involved in the joint site inspection?

    Correct Answer: The issuer and receiver.


20. Before receiving a work permit, what must the receiver do?

    Correct Answer: Pre Site Inspection.


21. Where should the work permit be kept post-issuance?

    Correct Answer: Within 75 feet of the work site.


22. When is a Release of Hazardous Liquids or Gases Permit necessary?

    Correct Answer: Pipe filters open a line or install blinds.


23. What are common topics during a joint site inspection?

    Correct Answer: Scope of work and equipment to be used, Hazards & Safety precautions.

You are reading Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.

24. When should the issuer verify equipment preparation for maintenance? 

    Correct Answer: During the joint site inspection.

25. Why do receivers join joint site inspections with issuers?

    Correct Answer: To discuss hazards and risks.


26. When is assigning a fire watch mandatory?

    Correct Answer: For any hot work.


27. What is a mandatory quality for a fire watch?

    Correct Answer: Trained.


28. What knowledge must a fire watch have? 

    Correct Answer: Operate fire equipment given to him.


29. What term describes someone with a specific skill required at a job site? 

    Correct Answer: Competent person.


30. What nonflammable substance is often used to purge process equipment?

    Correct Answer: Nitrogen.


31. What are the steps for preparing equipment for maintenance?

    Correct Answer: Shut down, isolate, and de-energize.


32. What methods are typically used for cleaning process equipment?

    Correct Answer: Water-washing and steaming.


33. Why are blinds installed in process equipment?

    Correct Answer: To prevent liquids or gases from contacting people.


34. Give an example of how electrical equipment is isolated. 

    Correct Answer: Locking electrical equipment.

35. What are two common methods of isolating equipment?

    Correct Answer: Shut down and clean; Install locks and take gas tests.


36. Why are locks and tags used on electrical breakers?

    Correct Answer: To explain why the lock is installed.


37. Who is typically responsible for installing locks?

    Correct Answer: One member from each work crew.

You are reading Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.

38. What additional purpose do tags serve beyond locks?

    Correct Answer: To explain the purpose of the lock.


39. What should an issuer check before reactivating equipment after isolation?  

    Correct Answer: Verify that it cannot accidentally start.


40. Who initially installs locks and tags? 

    Correct Answer: Maintenance.


41. What must be done by operations before removing their locks and tags?

    Correct Answer: Ensure equipment can be safely started.

42. Under what conditions is a Release of Hazardous Liquids or Gases Permit required again?

    Correct Answer: When operators release hydrocarbon to the flare.


43. Identify the requirements before permitting entry into a confined space.

    Correct Answer: Gas tests, fire extinguisher, barricades.


44. What activities are classified as cold work?

    Correct Answer: Scaffold building, housekeeping.

45. What distinguishes hot work from cold work?

    Correct Answer: Hot work uses an ignition source.


46. What is a primary hazard of performing hot work?

    Correct Answer: Ignition source.


47. What is considered when issuing a Gas Release permit?

    Correct Answer: Wind direction, drainage, ignition sources.


48. Why is it crucial to prepare equipment correctly for maintenance?

    Correct Answer: To ensure safety and efficiency in maintenance operations.

You are reading Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.

49. What is the role of a fire watch in welding on in-service hydrocarbon equipment? 

    Correct Answer: Ensuring immediate response to any fire outbreaks.

50. Why is a competent person necessary at a job site?

    Correct Answer: To handle specialized tasks requiring specific skills.


51. What is the importance of purging process equipment with nitrogen?

    Correct Answer: To prevent the risk of fire or explosion by removing flammable substances.


52. Why is isolation of equipment critical before maintenance work?

    Correct Answer: To ensure the safety of personnel and the integrity of the equipment.

53. Is the safety of the work site solely the responsibility of the issuer? 

   Correct Answer: False.


54. What responsibility is shared by issuers and receivers when signing a work permit? 

   Correct Answer: Maintaining safety conditions at the site.


55. Which locations are included in restricted areas?

   Correct Answer: Pump station, tank farms, and gas well.


56. Who can decide that work is low risk and does not need a work permit?

   Correct Answer: The issuer.


57. Who is required to sign the work permit upon its closure?

   Correct Answer: Issuer and receiver.


58. What action must the receiver take if work is halted?

   Correct Answer: Inform the issuer.

You are reading Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.

59. Under what condition can a work permit be issued for up to 30 days?

   Correct Answer: It is highly unlikely that conditions will change.


60. Who must sign a work permit to extend its duration?

   Correct Answer: The new issuer and receiver.


61. What do "use a fire blanket" or "hand dig only" represent in the work permit?

   Correct Answer: Additional precautions to prevent fire.


62. Work permits are authorized for: 

   Correct Answer: Specific work at a specific location.


63. Where can an issuer find information on which permit to issue for a special job?  

   Correct Answer: On the back of any work permit.


64. What does the information entered in the "extra work location" box control?  

   Correct Answer: Where the receiver can work.


65. What activities are considered as cold work?

   Correct Answer: Sand removal and scaffold building.


66. If a joint site inspection is not conducted, what must the issuer do?

   Correct Answer: Write the reason on the permit.


67. What information must the issuer include in the work permit?

   Correct Answer: Name, organization code, and badge number.


68. What details must the gas tester enter on the work permit?

   Correct Answer: Gas test results, name, and badge number.


69. Can any worker be assigned as a standby man?

   Correct Answer: False.

You are reading Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.

70. Why is it necessary to de-energize and depressurize equipment before starting work?

   Correct Answer: To prevent accidental start-up.


71. Who is responsible for initially installing locks and tags?  

   Correct Answer: Operation.


72. Installing locks and tags on electrical breakers is essential to prevent accidental:

   Correct Answer: Start-up of equipment.


73. Before work begins, the issuer must ensure equipment cannot start up accidentally by:

   Correct Answer: Testing at the field switch after isolation.

74. What occurs when operators change shifts?

   Correct Answer: Their keys are usually transferred to the next shift.


75. Equipment is isolated to ensure it cannot:

   Correct Answer: Start-up, leak, or cause electrical shock.


76. Why are hold tags installed?

   Correct Answer: To explain why the lock is installed.


77. Removing fuses from an electrical circuit or disconnecting electric wiring is an example of:

   Correct Answer: Isolating.

You are reading Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.


Conclusion for Aramco WPR Interview 

This comprehensive list of questions and answers is tailored to help candidates prepare for interviews for the role of a Work Permit Receiver at Saudi Aramco. Understanding these key aspects ensures not only a successful interview but also contributes to maintaining high safety standards in operational environments.

You are reading Saudi Aramco Work Permit Receiver (WPR) Interview Questions with answers.

You are reading Saudi Aramco (WPR) Interview Questions with answers.

Post a Comment

0 Comments